The installation process of tempered glass in shower rooms must meet the following core technical requirements:
1、 Preparation before installation
1: Personnel qualifications: Installation personnel need to undergo professional training and hold certificates to work, with the ability to identify drawings, use tools, and ensure safe construction.
2: On site survey: Accurately measure the matching degree between glass size and installation space. If the error exceeds the limit, adjust the plan and obtain customer confirmation.
3: Tool configuration: Essential impact drills (with tile/glass drill bits), level gauges, glass suction cups, neutral sealant and other specialized tools.
2、 Technical requirements for installation process
1: Fixed and Flatness:
The installation of the frame must ensure verticality and levelness, with a horizontal error of ≤ 2mm/meter and an overall vertical deviation of ≤ 40mm.
The connection between the top frame and the frame needs to be accurately positioned, and reinforced with adhesive particles after drilling to avoid uneven stress on the glass.
2: Glass processing:
Explosion proof measures: Explosion proof film ≥ 0.25mm must be pasted to ensure that fragments adhere after breakage.
Isolation protection: Install specialized pads between glass and profiles to reduce the risk of self explosion caused by hard contact.
Edge protection: Handle with care to avoid collision with corners (the most vulnerable parts), and tilt to avoid the wall when pushing into the pre embedded groove.
3: Sealing process:
Silicone sealing should be thin and uniform, with a focus on covering the bottom basin joints and glass gaps to ensure waterproofing.
3、 Acceptance criteria
1: Function: The sliding door opens and closes smoothly without any jamming, and there is no water leakage after closing; The magnetic door has a uniform suction gap and an opening and closing force of 15-40 Newtons.
2: Safety indicators: Check the glass 3C certification mark (must be laser/ink printed), and the fragment status must meet the requirement of ≥ 60 particles per 50 × 50mm area.
Key tip: Glass thickness is recommended to be 8mm (considering safety and hardware load-bearing), and hollow laminated glass should be used for large areas; Throughout the installation process, it is necessary to avoid sudden temperature changes or collisions with hard objects.
Type: Sliding,Pivot,Bifold Doors,Walk Ins&Bath Screems
Technical Type: Tempering, Acid Etching,Laminating etc.
Size: Custom Size
More product details: https://longboglass.com/product/7.html


Verre plat
Verre de traitement
Miroir
Verre spécial
Verre décoratif
Ajouter: n ° 2 Jinniu Sci. Park, Weisan Roadshahe City, Chine
Tél: +86 319 5919357
Courriel: export@longboglass.com
Mob ... + 86 19528907087
Copyright © 2022 Longbo Platform Information Technology Co., Ltd
Retour en haut
Ce site Web utilise des cookies pour vous garantir la meilleure expérience sur notre site Web.
Commentaire
(0)